Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 13 results ...

Basha, I M and Gab‐Allah, A A (1991) Value Engineering in Egyptian Bridge Construction. Journal of Construction Engineering and Management, 117(03), 393–401.

Committee on Construction Equipment and Techniques (1991) Trenchless Excavation Construction Methods: Classification and Evaluation. Journal of Construction Engineering and Management, 117(03), 521–36.

Duerr, D (1991) Transportation of Shippingport Reactor Pressure Vessel. Journal of Construction Engineering and Management, 117(03), 551–64.

Fisher, D J and O'Connor, J T (1991) Constructability for Piping Automation: Field Operations. Journal of Construction Engineering and Management, 117(03), 468–85.

Fondahl, J W (1991) The Development of the Construction Engineer: Past Progress and Future Problems. Journal of Construction Engineering and Management, 117(03), 380–92.

Hinze, J and Appelgate, L L (1991) Costs of Construction Injuries. Journal of Construction Engineering and Management, 117(03), 537–50.

Kelley, M N (1991) Ft. Drum Estimating and Bidding from Contractor's Point of View. Journal of Construction Engineering and Management, 117(03), 565–71.

Rasdorf, W J and Abudayyeh, O Y (1991) Cost‐ and Schedule‐Control Integration: Issues and Needs. Journal of Construction Engineering and Management, 117(03), 486–502.

  • Type: Journal Article
  • Keywords: Cost control; Scheduling; Construction management; Control systems; Information management; Interactive systems; Databases;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1991)117:3(486)
  • Abstract:
    Cost control and schedule control are two of the most important management functions in the construction industry. Major research efforts are focused on developing procedures for improving the effectiveness of cost and schedule control. As a result, researchers are concerned with the quality, integrity, and timeliness of data that flow through such control systems. A number of data models have been proposed to integrate cost‐ and schedule‐control functions, because such integration is viewed as the, solution to the many problems facing construction projects today. This paper provides an overview of cost‐ and schedule‐control functions, defines the desired control cycle, and discusses the problems and needs of cost‐ and schedule‐control functions. A number of integrated cost‐ and schedule‐control data models, which represent the state of construction research in this area, are discussed. The work‐packaging model is briefly described and is suggested as the most likely existing model to achieve the desired cost and schedule integration. Finally, the conceptual design of a foundational data model for control, based on relational concepts, is provided. The recommended design adopts the conceptual structures of the work‐packaging model.

Schubert, F N (1991) U.S. Army Corps of Engineers and Afghanistan's Highways 1960–1967. Journal of Construction Engineering and Management, 117(03), 445–59.

Seibert, J E and Evans, G W (1991) Time‐Constrained Resource Leveling. Journal of Construction Engineering and Management, 117(03), 503–20.

Thomas, H R (1991) Labor Productivity and Work Sampling: The Bottom Line. Journal of Construction Engineering and Management, 117(03), 423–44.

Warszawski, A and Navon, R (1991) Robot for Interior‐Finishing Works. Journal of Construction Engineering and Management, 117(03), 402–22.

Williams, T P (1991) Hypertext Data Base Applications in Construction. Journal of Construction Engineering and Management, 117(03), 460–7.